Ideal for logistics or workshop companies, or multi-offices, garage and commercial...
All the downspouts of the building were fixed, so that the height of the ceilings is higher and also the façade of the building.
It is divided into three sections:
GROUND FLOOR: 300m2 (corner facing the river)
SEMI-BASEMENT: 400m2.
BASEMENT: 1,300m2. With entrance and exit through the access ramp for vehicles; even large ones.
Vault. Currently there are 6 offices, 4 toilets, 4 doors to the street. It has different heights; In 4ml offices, it has a smoke outlet. Façade of about 22ml and a depth of about 13ml.
Next to Decthalon, the 9 D'Octubre Hospital, the Campanar ITV, the Turia riverbed, the Biopark, the IVI, Carrefour!!.
Location:
Partially exteriorFinishing carpentry :
SapeliType of windows:
Aluminum, GratingBuilding year:
1977 (47 year/s)Condition:
To renovate/moderniseEmission efficiency value:
1kg/m2/añoConsumption efficiency value:
1kg/m2/añoActivity sector:
Agroturismo, Automotive, Banking, Night clubs, Fashion, Jewerly, Logística, Offices, Shop, StorageNumber of separated areas:
9