House under construction with completion expected in September 2025. The duplex is distributed with a separate equipped kitchen, living room, bedroom and a bathroom with shower. On the upper floor there is a bedroom and an office, a sunny balcony and a terrace. There is pre-installation for air conditioning, electric shutters, a parking space and a storage room. The building has a lift and pre-installation for electric vehicle charging. 24-hour closed circuit video surveillance. Distant views of the sea and the park.
Garage:
Comunitary (1 Parking places)Furnished kitchen:
FurnishedKitchen type:
IndependentType of windows:
AluminumBuilding year:
2025 (0 year/s)Condition:
Under constructionEmission efficiency value:
4kg/m2/añoConsumption efficiency value:
21kg/m2/añoSecurity measures:
Video-surveillance